Due to additional necessary maintenance, the North Lock in IJmuiden will be closed on:
June 17, 2024 from 7:00 a.m. to 7:00 p.m.
June 18, 2024 from 7:00 a.m. to 7:00 p.m.
Due to maintenance, the Middle Lock at IJmuiden is closed on:
16 July 2024 from 07:00 to 15:00
If maintenance has to be postponed due to weather conditions, it will be carried out on 18 July 2024 from 07:00 to 15:00.
This obstruction will last as short as possible or as long as necessary.
Due to the replacement of the hydraulic steering system, the IJmuiden Small Lock is closed on:
July 16, 2024 from 7:30 a.m. to July 23, 17:30 p.m.
This is done daily during working hours from 7:30 a.m. to 17:30 p.m., outside of which the operation is returned to the operator.
Due to the replacement of the thydraulic steering system, the IJmuiden South Lock is closed on:
July 8, 2024 from 7:30 a.m. to July 15, 17:30 p.m.
This is done daily during working hours from 7:30 a.m. to 17:30 p.m., outside of which the operation is returned to the operator.
This permit relates exclusively to the bunkering of liquefied methane to another ship from the Alice Cosulich, or any other vessel from Fratelli Cosulich Shipmanagement Srl that is registered by the applicant and approved by the Director of the Central Nautical Management North Sea Canal Area, that is capable for liquefied methane.
-
The Port of Amsterdam’s annual report published today shows that the port is in transition. While revenues rose to €190.4 million, transhipment fell to 63 million tonnes. This is mainly due to a decline in fossil fuel transhipment.
Due to the replacement of the drive mechanism of the outer head, the North Lock at IJmuiden is closed for navigation on:
10 June 2024 from 07:00 to 14 June 2024 17:00
If the maintenance has to be postponed due to weather conditions, it will be carried out on 17 June 2024 from 07:00 to 21 June 2024 17:00.
Due to the replacement of the drive mechanism of the inner head, the North Lock at IJmuiden is closed for navigation on:
24 June 2024 from 07:00 to 28 June 2024 17:00 pm
If the maintenance has to be postponed due to weather conditions, it will be carried out on 1 July 2024 from 07:00 to 5 July 2024 17:00.
The Small and South Lock are closed due to the replacement of the barrier installation, the Kleinesluis and Zuidersluis in IJmuiden are closed at night for pleasure and commercial shipping on:
June 17, 2024 from 6:00 p.m. to June 18, 7:00 a.m.
June 18, 2024 from 6:00 p.m. to June 19, 7:00 a.m.
June 19, 2024 from 6:00 p.m. to June 20, 7:00 a.m.