You are here:
EndLESS Amsterdam tentoonstelling

Expression of Interest RIB Amsterdam

Request for Expressions of Interest (EoI) regional integrated backbone (RIB) for hydrogen transport in the North Sea Canal area.

RIB Amsterdam
Checklist

The reason for EoI for hydrogen

Gasunie and Port of Amsterdam want to jointly develop a regional integrated backbone (RIB) for hydrogen in the North Sea Canal Area (NZKG). To this end, they invite parties in the NZKG to submit an Expression of Interest (EoI) about the future use of hydrogen and the related use of infrastructure.

It concerns the construction of a thirty-kilometer high-pressure pipeline from IJmuiden to the Amsterdam Port Area and a pipeline in the port area itself. Gasunie and Port of Amsterdam intend to link this regional infrastructure to Gasunie's national hydrogen backbone, which is expected to be ready by 2027. In this way we facilitate connections with other industrial regions in the Netherlands and abroad and with hydrogen storage in the Northern Netherlands. This brings the development of a hydrogen economy in the NZKG one step closer.



Feasibility study succesfully completed

The feasibility study into the construction of hydrogen infrastructure in the NZKG was successfully completed at the beginning of 2021. The subsequent assessment phase is scheduled to be completed before the summer of this year. Before starting the project phase, it is important to have sufficient insight into the interest from the market. That is why all parties, and in particular potential launching customers, who want to use the hydrogen pipeline in the future are called upon to submit an EoI.

Duurzame haven

What we want to achieve with the EoI

The information from the EoI will be used to:

  • Enable Gasunie and Port of Amsterdam to define the design parameters for the high-pressure network;
  • Consult and involve interested parties in the development of open-access hydrogen transport infrastructure;
  • To obtain certainty of sufficient interest in the regional hydrogen infrastructure before investments are made in the next phase of development;
  • Provide information to interested parties about the development prospects of the regional hydrogen infrastructure in relation to possible investments in the production or use of hydrogen;
  • Coordinate the steps and agreements towards a final investment decision (FID) together with interested parties;
  • To further shape the process towards defining the contract structure and conditions in consultation with interested parties.
H2 Icoon baken

Documents to be completed by 15 May 2021

Parties can express their interest in the use of a future hydrogen transport pipeline in the region on an individual basis. Interested parties do this before May 15, 2021, by:

  • Completing the digital questionnaire.
  • Signing the copy that you receive in your mailbox and send it to the contact person below.
  • Signing the confidentiality agreement (NDA) and returning it to the contact person below.

The parties will be informed about the next steps after May 15, 2021.

Download confidentiality agreement

Digital questionnaire: Expression of Interest

Disclaimer:
The purpose of this document is solely to invite parties to express their interest in contracting possible future services to be developed by Gasunie Waterstof Holding B.V. and Havenbedrijf Amsterdam N.V. (hereinafter referred to as the RIB Amsterdam Parties) in connection with the RIB Amsterdam Project (as defined below). Nothing in this document constitutes neither today nor in the future an offer or an obligation on behalf of the RIB Amsterdam Parties to effectually make available and provide such services to any interested party and therefore this Expression of interest is mutually non-binding.

I understand that RIB Amsterdam Parties do not, in any way or form, compensate for any cost that may arise from this EOI.


Please note: all fields of the digital form are mandatory. If the information is not known, please fill in not applicable 'na'.
The interested Party:
  1. Develops a hydrogen project aimed at reducing greenhouse gas emissions in any form, whereby a connection to the Regional Hydrogen Infrastructure is foreseen.
  2. Expresses its non-binding interest to contract services related to the transport of hydrogen via the Regional Hydrogen Infrastructure.
  3. Envisages the contracting of transport capacities and related services (multiple entries possible for several exclusive processes) with the specifications as described in the data sheet below. The Interested Party plans/intends to put in reasonable efforts to follow up on these intentions.
Note: 
If you have multiple projects with different timelines, volumes, capacities or locations please feel free to copy the data sheet on the next page and fill it in accordingly.
Annual expected volume to be transported in GWh
(based on a 100% hydrogen composition, HHV 12,74 MJ/Nm3, 0,090 kg/Nm3)
Peak capacity transport system in MW
(based on a 100% hydrogen composition, HHV 12,74 MJ/Nm3, 0,090 kg/Nm3)
Date for gate decisions (mm/yyyy), e.g.: 
  • Pre-feasibility
  • Feasibility
  • FEED/basic engineering 
  • FID 
  • RfO (Ready for Operations)

Contact

For questions or remarks, please do not hesitate to contact me.

Floris van Foreest

Floris van Foreest

Project Manager Hydrogen Infratructure