IJmuiden North Lock closed to shipping traffic (Phase B)

2022/73
From 20 Feb 2023 until 24 Mar 2023
Area - Lock

Due to the replacement of the rail track (Phase B) of the inner lock head, the IJmuiden North Lock will be closed to shipping traffic during the following period:

  • From 20 February 2023 07.00 LT to 24 March 2023 19.00 LT.

The above-mentioned lock closure will be as short a possible or as long as necessary.

During the closure of the North Lock, Zeesluis IJmuiden (the new sea lock) will be operational.

Basijn 732022 nl.pdf (pdf 200kb)
Basijn 732022 uk.pdf (pdf 278kb)