IJmuiden North Lock closed to shipping traffic (Phase A)

2022/72
From 23 Jan 2023 until 17 Feb 2023
Area - Lock

Due to preparatory work for the replacement of the railtrack (Phase A), the IJmuiden North Lock will be closed to shipping traffic during the following period:

  • 23 January 2023 to 17 February 2023 during working days from 07.00 to 19.00 LT.

The above-mentioned lock closure will be as short a possible or as long as necessary.

During the closure of the North Lock, Zeesluis IJmuiden (the new sea lock) will be operational.

Basijn 722022 nl.pdf (pdf 131kb)
Basijn 722022uk.pdf (pdf 134kb)