IJmuiden Middle Lock closed for navigation

2022/63
From 07 Dec 2022 until 07 Dec 2022
Area - Lock

Due to scheduled maintenance, the IJmuiden Middle Lock will be closed for a FIT-test on

  • 7 December 2022 from 08.00 hr to 16.00 hr LT.

If the FIT test has to be postponed due to weather conditions, it will be carried out on 14 December 2022 from 08:00 to 16:00 hr LT.

Basijn 632022 nl.pdf (pdf 123kb)
basijn 632022uk.pdf (pdf 147kb)