Departing car carriers with a length of more than 180 m which leave stern first from the Westhaven must have a second pilot on board.
This Decree will come into force on 9 June 2024.
Departing car carriers with a length of more than 180 m which leave stern first from the Westhaven must have a second pilot on board.
This Decree will come into force on 9 June 2024.
With effect from 9 June 2024, a second pilot will be required on board the following seagoing ships:
Because of the demolition of the old port office of the Port of IJmuiden, a work area will be established in the period from 11 June 2024 to 2 August 2024 near the old port office of the Port of IJmuiden on the Halkade.
The applicant is granted a permit to bunker liquefied methane with the above-mentioned bunker ship FlexFueler 001 and the above-mentioned bunker ship FlexFueler 002 within the municipalities of Amsterdam, Velsen and Zaanstad.
Due to additional necessary maintenance, the North Lock in IJmuiden will be closed on:
Due to maintenance, the Middle Lock at IJmuiden is closed on:
If maintenance has to be postponed due to weather conditions, it will be carried out on 18 July 2024 from 07:00 to 15:00.
This obstruction will last as short as possible or as long as necessary.
Due to the replacement of the hydraulic steering system, the IJmuiden Small Lock is closed on:
July 16, 2024 from 7:30 a.m. to July 23, 17:30 p.m.
This is done daily during working hours from 7:30 a.m. to 17:30 p.m., outside of which the operation is returned to the operator.
Due to the replacement of the thydraulic steering system, the IJmuiden South Lock is closed on:
July 8, 2024 from 7:30 a.m. to July 15, 17:30 p.m.
This is done daily during working hours from 7:30 a.m. to 17:30 p.m., outside of which the operation is returned to the operator.
This permit relates exclusively to the bunkering of liquefied methane to another ship from the Alice Cosulich, or any other vessel from Fratelli Cosulich Shipmanagement Srl that is registered by the applicant and approved by the Director of the Central Nautical Management North Sea Canal Area, that is capable for liquefied methane.
Due to the replacement of the drive mechanism of the outer head, the North Lock at IJmuiden is closed for navigation on:
If the maintenance has to be postponed due to weather conditions, it will be carried out on 17 June 2024 from 07:00 to 21 June 2024 17:00.