Works at kmp 8, south bank North Sea Canal

2026/27
From 05 October 2026 until 09 October 2026
Area Municipality - ANZKG

Work will be carried out for the installation of a measuring structure at the existing jetty at kilometre marker 8 on the south side of the North Sea Canal.

Basijn 272026 nl.pdf (pdf 283kb)
Basijn 272026 uk.pdf (pdf 175kb)