You are here: Home News

News

Filter on:
All
About:
All
Or:
All
waterstof molecuul
02-06-2021

Creation ‘HyXchange’ hydrogen exchange a step closer

The growing demand for climate-neutral hydrogen creates the necessity for the market to work properly and for transparent, efficient pricing. A hydrogen exchange will be able to facilitate both. The new hydrogen exchange will be called HyXchange.
Samskip Port Waterford
27-05-2021

Samskip adds bigger ship and Waterford call to Amsterdam-Ireland links within months of launch

Direct Ireland-Netherlands route realises advantages of border-free transit and new investments in container rail freight at both ends.
Duiken Zeesluis IJmuiden
22-04-2021

Diving operations at Zeesluis IJmuiden

There are also divers at work for the construction of Zeesluis IJmuiden (the new sea lock). They are busy with underwater engineering and construction activities. Max Schellenbach and Jan-Pieter Steunebrink of Boskalis are responsible for the Boskalis diving department and the execution of the work for OpenIJ. They told us about the work of their divers.
bodembescherming Zeesluis IJmuiden
22-04-2021

Three questions to Bart and Henk about the bottom protection system for Zeesluis IJmuiden

A larger lock means bigger ships and more salt water. The locking process creates large volumes of fresh or salt water flowing into or out of the lock and water turbulence may scour out holes near the inner and outer lock heads, undermining them.
Terreininrichting Zeesluis IJmuiden
22-04-2021

The how, what and where of the site layout of Zeesluis IJmuiden

The construction of Zeesluis IJmuiden is almost completed. Now that all the lock gates have been put in position, the area around the new sea lock is being prepared for its future use. During the preparation of the area, everything will be made ready for the opening of the lock.
Sluisdeuren Zeesluis IJmuiden ingevaren
22-04-2021

All the lock gates have been put into position

In March 2021, the last two lock gates on the canal side were successfully installed. The whole operation lasted four days. Edgar Breedveld and Victor Arnolds were involved in this milestone achievement. They directed the positioning process and ensured a good outcome.